Yamato DHS810
- Fabricante: Yamato
Method: Forced convection and ventilation | Operating temperature range: Room temp.+15~360℃ | Max. temp. reaching time: Approx. 50 min.(at 360℃) | Temperature adjustment accuracy: ±0.3℃(at 360℃) | Temperature dis...
Tokio, JapónYamato DE411
- Fabricante: Yamato
Temp. distribution accuracy: ±2.5°C (at 260°C) JTM K05 | Max. temp. reaching time: Approx. 70 min. (at 260°C) | Heater: Stainless pipe heater | Cable hole: 33mm I.D. ×1 | Timer: 1 min. to 99 Hrs. 59 min | Operati...
Tokio, JapónYamato DH612
- Fabricante: Yamato
System: Forced convection and ventilation | Operating temp. range: Room temp. + 15 to 360℃ | Temp. control accuracy (jtm k05): ±0.2℃(at 360℃) | Temp. fluctuation (jis): 2.0℃(at 360℃) | Temp. distribution accuracy...
Tokio, JapónYamato DH412
- Fabricante: Yamato
System: Forced convection and ventilation | Operating temp. range: Room temp. + 15 to 360℃ | Temp. control accuracy (jtm k05): ±0.2℃(at 360℃) | Temp. fluctuation (jis): 2.0℃(at 360℃) | Temp. distribution accuracy...
Tokio, JapónYamato DNF601
- Fabricante: Yamato
Method: 2 in 1 type: Forced and Natural convection, with manual exhaust damper | Heater: 0.83 kW×2 | Exhaust port: 50mm I.D. (Back)×1pc. | Additional functions: Heater operation amount, Power failure recovery mod...
Tokio, JapónYamato DNF301
- Fabricante: Yamato
Method: 2 in 1 type: Forced and Natural convection, with manual exhaust damper | Heater: 0.8kW | Exhaust port: 50mm I.D. (Back)×1pc. | Additional functions: Heater operation amount, Power failure recovery mode, U...
Tokio, JapónYamato DNF411
- Fabricante: Yamato
Method: 2 in 1 type: Forced and Natural convection, with manual exhaust damper | Heater: 0.6 kW×2 | Exhaust port: 50mm I.D. (Back)×1pc. | Additional functions: Heater operation amount, Power failure recovery mode...
Tokio, JapónYamato DNE811
- Fabricante: Yamato
- Modelo: DNE811
Operating temp. range: Room temp. +15 to 210°C | Temp. adjustment accuracy: ±0.5°C (at 210°C) | Temp. distribution accuracy: ±2.0°C (at 210°C) | Max. temp. reaching time: Approx. 45 min. | Interior/exterior mater...
Tokio, JapónYamato DNE650
- Fabricante: Yamato
Method: Forced air circulation | Operating temperature range: Room temp. +10°C to 260°C | Temperature adjustment accuracy: ±0.2℃(at 260℃) | Temperature distribution accuracy: ±2.0℃(at 260℃) | Time to attain max. ...
Tokio, JapónYamato DKN912
- Fabricante: Yamato
- Modelo: DKN912
Circulation method: Forced air circulation | Operating temp. range: RT +10°C to 210°C | Temp. adjustment accuracy: ±1℃(at 210℃) | Temp. distribution accuracy: ±2.5℃(at 210℃) | Max. temp. reaching time: Approx. 60...
Tokio, JapónYamato DKN402
- Fabricante: Yamato
- Modelo: DKN402
Circulation method: Forced air circulation | Operating temp. range: Room temp. +10°C to 250°C | Temp. adjustment accuracy: ±1℃(at 210℃) | Temp. distribution accuracy: ±2.5℃(at 210℃) | Max. temp. reaching time: Ap...
Tokio, JapónYamato DKM300
- Fabricante: Yamato
Circulation method: Forced air circulation | Operating temperature range: Room temp. +10~260°C | Temp. control accuracy: ±1°C (at 210°C) | Temp. distribution accuracy: ±2.5℃(at 210℃) | Max. temp. reaching time: A...
Tokio, JapónYamato DKM600
- Fabricante: Yamato
Circulation method: Forced air circulation | Operating temperature range: Room temp. +10~260°C | Temp. control accuracy: ±1°C (at 210°C) | Temp. distribution accuracy: ±2.5℃(at 210℃) | Max. temp. reaching time: A...
Tokio, JapónYamato DKG811V
- Fabricante: Yamato
Method: Forced convection | Operating temperature range: Room temp. +30°C to 260°C | Temperature adjustment accuracy: ±0.5℃ | Temperature distribution accuracy: ±2℃(at 200℃)、±2.5℃(at 260℃) | Time to attain max. t...
Tokio, JapónYamato FP413
- Fabricante: Yamato
- Modelo: FP413
Operating temp. range: 100~1,150℃ | Temp. control accuracy: ±1.0℃(at 1150℃) | Temp. fluctuation: 2.0℃(at 1150℃) | Temp. distribution: ±4.0℃(at 1150℃) | Temp. gradient: 14℃(at 1150℃) | Max. temp. reaching time: Ap...
Tokio, Japón